School Building Construction

Description

School Building Construction Detailed Project Report (DPR).

 

How much money does it take to start school?
This is not a single answer to this question. It is determined by a lot of factors. Some of the major factors are

All your answers to HOWTS.

  • Land cost – where are you buying it, how much are you buying it.
  • What is the ability you target?
  • How do you position your school in the target market?

Answer these questions and make up your mind how you envision the facilities in your school. This will help you in answering this question.

What will be the estimated cost of construction (civil work) for the school building?

This query invites a subjective response but a rule of thumb for beginners/planners. 2 acres of land at the market price and the cost of construction is around 1500/2000 rupees per sq ft…Land & Site Development.

Building Cost.

Furniture & Fixtures.

Electrical Items.

Interest on Loans if any.

Each of these can be broken into several headings. A huge amount of detail is involved when planning a thoughtful infrastructure. Please spend a lot of time while going through the list of planned and related expenses.

What should I account for under the head – operating expenses.

Mostly spends such as salaries, repairs, maintenance as well as co-curricular activities/awards/scholarships etc., although a school does not require a lot of maintenance and it is unlike any brick and mortar based facility in that regard. it happens. But the children involved have to be prepared for the loss and later be prepared for the maintenance of the property.

What is a typical school project break-even period?

This is a very subjective call to indicate a break-even for such an enterprise. It depends entirely on the success of the venture and the amount of capital invested. However, the operational brake also will not take much time to come. Medium success should also break down within a time frame of 8–10 years for a medium financed enterprise meeting.

How to have an account for revenue?

Revenue comes in the form of duty. If you are a start-up and hungry for entry, you may find it difficult to retrieve the fees in due time, be prepared with cash flow from your end.Some organizations may generate income through renting out the building for other purposes, which can also be attributed to revenue.

What should be the strength of my teaching and non-teaching staff?

To start a school you will need the following personnel or class of people.

  1. Principal.
  2. Co-ordinator / Head Master.
  3. Teachers ( PRT / NTT / PGT/ PTI / TGT / Dance/ Art / Music / Craft).
  4. Aya Bai (Maids).
  5. Lab Assistants..Chaperons (Peons).
  6. Computer Operator..Admin Staff.
  7. Accountant / Accounts Staff.
  8. Grade-III / IV Staff like Nurse, Driver, Gardener, etc.
  9. For non-teaching staff, you can work based on your needs and requirements.

As far as teaching staff goes, you have to get 1.5 teachers per section. For example, you are running a school form from class I to class III and each part of the class has 3 sections, with 9 classes for you. The required teacher will be 1.5 X 9 = 13.5 = 14 teachers. The principal is not included in this mathematics…The required qualifications for each teaching staff and principal are available in the bye-laws of all affiliation boards.

What separates the Provident Fund for Schools (EPF) from other organizations?

Registration is compulsory under the EPF: for each notation engaged in the hiring of 20 or more employees. For each employee who is receiving less than INR 15000 / – per month.

 

What are the normal student-to-teacher ratios, room/lab/library proportions, and so on?

A minimum dimension has been set by CBSE for classes, libraries, etc., but those numbers are not obtained as it will all depend on your intake in each class. No more than 45 students should attempt in a class.Just to give you a perspective, here is the CBSE set for classes. (By-law form).The infrastructural facilities should be as follows: –

(i) Classroom – Minimum size should be 8 m x 6 m (approx 500. sq ft).

(ii) Science labs. (for Secondary or/and Senior Secondary for separate Chemistry and Biology, Physics, ) – Minimum size 9 m.x 6 m.each (approx. 600 sq. ft) and must be fully furnished.

(iii)Library – A minimum size of 14 m x 8 m is necessary. Fully furnished and equipped with reading materials.

(iv) Computer Lab And Math Lab – There is no minimum size set, however, the school should have a separate provision for each.

(v) Extracurricular activity rooms – either separate rooms for dance, art, music, and sports, or a multi-purpose hall for all of these activities – should be open.

Also, there may be different criteria for different state boards, please understand these prerequisites thoroughly before planning your building.

What are the facilities I have to account for which conceiving the building structure?

This may be an endless list, but some facilities have become sanitary for new and upcoming schools. Here are some pointers;.

  1. Multimedia enabled classrooms (classrooms with projectors and multimedia content).
  2. Art Lab.
  3. Craft Studio.
  4. Music Studio.
  5. Dance Room.
  6. Activity Hall.
  7. Sports Facilities – Indoor and Outdoor.
  8. Language Labs.
  9. Maths Lab.
  10. Composite Science Labs for junior classes.
  11. Labs for higher classes – Biology / Physics / Chemistry.
  12. Transport facility

Is it mandatory for CBSE schools to keep their websites up to date?

Answer. Yes, schools are required to develop and maintain their own website providing important information about the school on the website.

What is the validity period of the lease/sub lease deed?

Ans. In case of lease / sub-lease, the lease deed of the land/building should be duly registered with the concerned registration authority of the state and should be for a minimum period of 15 years.

The period of validity of the lease or any other documents should be such that the property, Which guarantees the enjoyment of legal rights over the land for five years or more before the session for which an application for preliminary affiliation has been submitted.

 

What would be the optimum enrollment of students?

Ans. The optimal number in a section of a square is 40.The availability of floor area built up to one square meter per child in classrooms is an absolute necessity in the school.

What are the facilities of the playground in the school?

Ans. Enough land to build outdoor facilities for at least 200 meters of athletics track. Facilities for junk, kho-kho, volleyball, basketball etc. In all cases where affiliation is given on exempted land norms, the outdoor facilities will be proportional to the available land.


What facilities are available in school laboratories?

Ans. The minimum size of North School Laboratories which includes Composite Science Laboratory or/and separate Physics, Chemistry, Biology Laboratory and Computer Science Laboratory should be 9 meters. x 6 m. Each (about 600 square feet).

How many computers are required in a computer lab?

Ans. The school should have a computer science lab with at least 20 computers and must maintain a computer to student ratio of 1:20.

What will be the criteria for the boundary wall?

Ans. The school should have a paved concrete wall or wall with an iron grilled fencing with a height of 6 feet around the campus of the school.

What do commercial activities mean in school?

Ans. Multiple-use of school building is permitted for limited purposes of promoting education and skill development including vocational education but the school will not use its building and infrastructure for any professional activity.

What facilities are required in the school for students with special needs?

Ans. The School should have facilities such as ramps at entry/exit points and toilets etc. for wheelchair users as per the provisions given in RPWD Act-2016.

School Building Construction Detailed Project Report (DPR)

Here, our School Building Construction Detailed Project Report (DPR) deliver after thorough project analysis, which is created based on deep research and rich in graphics and pictorial view and contain required information or data to fulfill its purpose for Bank loan, Government Sponsored Scheme etc. 

 

Our report data is up to date and easily impress your lender as these School Building Construction Project Report made by Chartered Accountants. Project reports having unbeatable quality, extraordinary project reports, trusted by thousands of people. 

 

In our reports, you get every micro detail and accurate level of calculation as per the banking guidelines, acceptable to every bank, Non-Banking Financial Company, Government Departments and other financial institutions etc. These reports are very straight forward contain honest descriptions, neat, readable, and to-the-point. Reports are well spaced with titles and subtitles and are free of language errors.

 

Our report preparation team makes sure that the report is concise and transmits maximum information with minimum words. It guides you to show a roadmap for your business in the longer term. Every bank always has a look at your project report before they lend out any money. It’s important to have a report that’s clear with simple language, easy to understand and one that will offer a real insight into the business ideas that you have.

 

Project Report Format

 

In our project report format, we cover technology details, its diagrams, flow chart etc.. as and when required or deemed fit to include. Also, prepare in-depth financial calculations including CMA which is necessary for the Investor/bank.

 

Key Points Cover in Detailed Project Report on School Building Construction

 

As mentioned above, School Building Construction Detailed Project Report (DPR) is a complete package that contains everything that requires getting funds up to 25 Crores (Twenty Five Crores). Checkout our DPR sample to make your vision more clear. Usually, the Detailed Project Report (DPR) is needed when you apply for a bank loan or Government scheme. Project Report Bank aims to create the reports accurately from the start and make sure that businessmen get the right value and results from the reports.

 

The following are the key points we generally covers while making DPR, whichever relevant to your business :- 

 

  • Introduction to Project and Industry
  • Executive Summary
  • Profile of the business in the country
  • Project Evaluation – Social Angle
  • Analysis of basic variables
  • Socio- Economic Advantage
  • Impact on environment
  • Foreign Trade Income
  • Value addition
  • Import replacement
  • Technology assimilation and so on
  • Present condition of the business
  • Consumer Inclinations
  • Market Prerequisites
  • Market Portions
  • Distribution Channels
  • Market Qualities of the Item
  • Export Possibilities and Global Market
  • Marketing and selling game plans
  • SWOT Analysis

CMA Data – Credit Monitoring Arrangement Data

  • Particulars Of Existing / Proposed Bank Credit Facilities (Form – I)
  • Projected Profitability Statement ( Form – II)
  • Projected Balance Sheet (Form – III)
  • Comparative Operation Statement (Form – IV)
  • Maximum Permissible Bank Finance MPBF – (Form – V)
  • Cash Flow Statement – (Form – VI)

Monetary Projections Details Contains:

  • Cost of Project & Means of Finance
  • Details of Raw Materials 
  • Details of Utilities
  • Human Resources Planning 
  • Technical Manufacturing Business Process
  • Assumptions in monetary projections
  • Projected Sales & Production
  • Cost of Production and Profitability
  • Fund Flow Statement
  • Working Capital Cycle
  • DSCR – Debt Service Coverage Ratio
  • BEP – Break Even Point Analysis
  • IRR – Internal Rate of Return
  • ISCR – Interest Service Coverage Ratio
  • Calculation of payback period
  • Debt to Equity Ratio
  • Working Notes for Monetary Projections
  • EBIT – Earnings before interest and taxes
  • EBITDA – earnings before interest, taxes, depreciation, and amortization
  • Cash Burn Rate
  • Discounted Cash Inflow & Outflow
  • NPV – Net Present Value
  • Net Worth

Report Size : 40 – 50 Pages,

In which, Financial Projections : 18 – 20 Pages

Get Detailed Project Report

Gone are the days waiting at the door of the expert , as a result, get you School Building Construction project report in hand, now you can get you business plant in just 7 days.

First Step            –   Click add to basket  >>  Check Out  >>  Payment

Second Step       –   Provide Required Information on What’s App No.                                                      9301130551 or Email on [email protected]

Third Step           –   Get report within 7 days in PDF format. 

Don’t gamble anywhere, if you are serious about your business plan then Project Report bank is the right place to higher for the preparation of your detailed reports.  

To save time, we deliver reports over e-mail in a high-resolution PDF file and also provide hard copy through courier service in a given period. Our one more positive thing is that we provide 3 times free changes to your document post-delivery for up to 6 months and thereafter, on minor charges.

 

Every financial formula required by the bank is contained in a comprehensive School Building Construction project report. To get the sample financial project report on WhatsApp, kindly share your details with our support specialist and get it easily. Also, you can contact our support specialist by just clicking the HELP button on the bottom right corner of this screen. Our project report assistance helps in explaining the features of the reports to make you more clear and understandable on different project reports.